Use a chain link fence pole.
I saw the install the tech did at my dad's house recently and it was really choppy...exposed cable running around the base of the house. I'd like to pre-prep and route the cables myself. I have the concealed cable routes all ready to go. I may opt to have pull-string ready for the tech and just have him provide the proper cable. Just would like to have some control over the aesthetics of the install.Why not just pay the custom install fee and let a Tech install everything which would be cheaper than trying to find small amounts of cable that you will need.
Pipe OD is the same for all schedules. 1-1/4" schedule 40 pipe has an ID of 1.38".If using standard iron pipe, the OD of most Schedule 40 1-1/4" ID pipe will work.
Power meter, ac disconnect box, cold water pipe, 8' ground rodThanks guys for the help and suggestions. Based on feedback I'll install conduit from dish pole to house with pull string and let the installer take it from there. Grounding...umm, nothing currently available where the pole will go. IF I were to pre-prep that, not sure what it would involve. What would be considered a proper ground???
Limited time offer