projects to do once it either gets warmer or the snow melts off the roof
-rerun a cable from the motorized to inside. Right now my "slave" cable is in two pieces
-move a few LNB's around on the T90 dish. Want to put 87 back on for the PBS stuff (now that the CS8000 decodes AC-3 in the box). Also put IA6/G26/T6 back on.
-redo the cabling under the deck and clean it up
-put compression connectors on the cables that have the twist on ends
But using Keith's theory, I'll do it all when its cold out. Working under the deck isn't bad when I'm doing laundry as the dryer vent is right there so we just warm up the hands with the dryer exhaust
Limited time offer